How do we manage the risks arising from tool call errors?

By Carver Agents · Published 2026-11-10 · Updated 2026-11-10 · Content checked 2026-11-10

Technical/editorial preparation guidance checked against linked sources. No jurisdiction-specific legal opinion, underwriting decision, or independent legal review is claimed.

Jurisdiction: Not jurisdiction-specific

Start with a real incident

Thanks to Prof. William Baude for sharing what happened when an AI agent deleted his notes. As reported by Dexerto, he said the files were recovered from Dropbox. It started a conversation every team running agents should be having. This guide shares it with some possible technical approaches.

A framework to think about the actions

1. How risky is this action?

Reading a file is low risk. Deleting client records, sending an email or moving money is not.

2. Can the action be verified?

Can we see the updated records or sent mails to check whether the action has been attempted and completed? For long-running actions such as order fulfillment, do we know how and when to determine that there has been an error or failure?

3. Can it be undone?

Some actions can be restored from a snapshot or version history. Some can be staged and only committed after a check. Some, like a sent email, can’t be taken back at all.

4. What does undo cost?

Snapshots cost storage, version history costs engineering, and staging costs time. Spend that only where a mistake would cost more than the delay.

Read the four questions as separate dimensions

This table is an organizing aid, not a scoring model. It does not assign probabilities or numerical risk scores.

Question Dimension it informs What to establish
How risky is this action? Consequence Whether the action reads, deletes, sends or moves something, and what it could affect
Can the action be verified? Uncertainty Whether the result can be inspected, and how and when a failure of a long-running action would be detected
Can it be undone? Mitigation Whether there is a snapshot or version history, a staged commit after a check, or no way back
What does undo cost? Cost of the control Storage, engineering and time, set against the cost of a mistake

Fast path and deliberate path

The approach depends on the risk profile of actions individually and collectively. It is not rocket science, and in software we have done it many times. It is better to get into the discipline before the tools and tasks proliferate.

Path Use it for What it involves
Fast path Low-risk, undoable actions The action proceeds without extra steps
Deliberate path Risky or permanent actions A slower route with checks and fallbacks

Where Carver Agents fits

Carver Agents works on this policy assurance layer: carveragents.ai. To check the regulatory context of an AI agent, use the assessment on this site. An automated result is a starting point for a team and its counsel, not legal clearance.

Sources

Educational technical and risk-management context only; not legal, insurance, or underwriting advice. The framework is illustrative. Verify the relevant facts, current sources, and actual system behavior with an appropriately qualified professional.

Check your AI agent’s regulatory context →